What Is LA's Mandatory Soft-Story Retrofit Program, and How Can It Affect Buying or Selling an Apartment Building?

by Andrea Pazmino-Pace

What Is LA's Mandatory Soft-Story Retrofit Program, and How Can It Affect Buying or Selling an Apartment Building?

Los Angeles's Mandatory Soft-Story Retrofit Program requires owners of older wood-frame apartment buildings with weak ground floors — think carports, tuck-under parking, or large storefront windows — to structurally reinforce them against earthquakes. If you are buying or selling one of these multi-unit buildings, confirming its retrofit status can affect financing, insurance, and your negotiating position.

What Makes a Building a "Soft-Story" Seismic Risk?

A soft-story building has a weaker first floor that is not able to carry the weight of the stories above it during an earthquake. The ground floor generally has large openings in the perimeter walls, such as garages, tuck-under parking, or oversized windows, which leave it structurally weaker than the floors stacked on top. Los Angeles created its mandatory retrofit program after studying the building failures and lessons learned from the Northridge earthquake, which exposed just how vulnerable this style of wood-frame construction can be.

Which Los Angeles Buildings Are Covered by the Ordinance?

The city's Mandatory Soft-Story Retrofit Program applies to wood-frame buildings of two or more stories that were built under codes enacted before January 1, 1978, with ground-floor parking or similar open space that creates soft, weak, or open wall lines. The program does not apply to residential buildings with three or fewer units, which means most older fourplexes and larger apartment buildings in Los Angeles are the ones that fall squarely within scope.

What Is the Retrofit Timeline Once a Building Receives an Order to Comply?

Once the city issues an Order to Comply, the owner generally has about two years to submit retrofit (or demolition) plans, three and a half years to obtain a permit, and seven years total to complete construction and receive a Certificate of Compliance. Owners can appeal an Order to Comply within 60 days to the Board of Building and Safety Commissioners. The program itself was established back in 2015, so many Los Angeles buildings subject to it have already received their orders years ago — which means a given building should, by now, either show a completed retrofit or be well into an active compliance or enforcement timeline, rather than just starting the process.

How Can Buyers and Sellers Check a Building's Retrofit Status?

The Los Angeles Department of Building and Safety maintains a searchable list of soft-story buildings by address. Before writing an offer on an older multi-unit building, buyers should check that list directly and ask the seller for the building's Certificate of Compliance, permit history, and any Order to Comply correspondence. An incomplete retrofit is a legitimate negotiating point, since both the remaining cost and the compliance deadline transfer with the building to its new owner.

Who Pays for the Retrofit — and Can Costs Be Passed to Tenants?

The property owner is responsible for financing, permitting, and completing the retrofit work. Under a related city ordinance, owners of rent-stabilized (RSO) units are allowed to pass through a portion of the retrofit cost to tenants as a capped monthly rent surcharge spread out over time, rather than billing it all at once. Buyers evaluating an occupied building with a pending retrofit should factor both the construction cost and any existing or future tenant surcharges into their underwriting before closing.

Frequently Asked Questions

Does every apartment building in Los Angeles need a soft-story retrofit? No. The program targets older wood-frame buildings built under codes enacted before 1978 with soft or weak ground floors and four or more units. Single-family homes, duplexes, and triplexes, along with concrete- or steel-frame buildings, are not covered by this particular ordinance.

How do I find out if a specific building has already completed its retrofit? Check the Los Angeles Department of Building and Safety's searchable soft-story buildings list by address, or ask the seller for the building's Certificate of Compliance, permit history, and any Order to Comply correspondence.

Can a lender refuse to finance a building that has not been retrofitted yet? It is common for lenders and insurers to ask about soft-story status during underwriting, and an outstanding retrofit can affect loan terms, insurance premiums, or how quickly a deal can close, so confirming status early in escrow is worth the effort.

If I buy a building with a retrofit still pending, am I responsible for finishing it? Yes. The retrofit obligation runs with the property rather than the individual owner, so an incomplete retrofit becomes the new owner's responsibility and should be negotiated into the purchase price or resolved before closing.

Updated for November 2026.